A Thermic Lance (commonly known as a Slice Rod) is a steel pipe packed with mixed metal wires. Pure oxygen gas is passed through the pipe from an oxygen cylinder and regulator. The end of the pipe is lit with a high temperatures source, e.g. an oxy-acetylene torch.
The iron in the steel burns in the oxygen coming down the pipe to produce enormous heat and a liquid slag of iron oxides and other materials dribbles and splashes out.
Thermal Cladding Lance Inconel 625 Nickel Base Alloy ASTM
Place of Origin | CHINA |
---|---|
Brand Name | CHEONNY |
Certification | ISO, ASME, EN, Grade A |
Model Number | CMT20210427001 |
Minimum Order Quantity | 50 tons |
Price | Negotiable |
Packaging Details | Iron Frame Packing for exporting |
Delivery Time | Within 70 days after receiving the DP or L/C at sight |
Payment Terms | L/C, T/T, Western Union |
Supply Ability | 1,000 tons per month |
Application | Industry,oil And Gas | Grade | Nickel Base Alloy,Inconel 625 |
---|---|---|---|
Type | Nickel Pipe,Nickel Tube/pipe | Shape | Inconel Tube / Pipe |
Material | Inconel,Monel/Inconel/Incoloy/ Hastelloy/PH Stainless Steel,Inconel 600/UNS N06600 | Standard | Inconel600,EN,ASTM |
High Light | CHEONNY Thermal Cladding Lance,ISO Cladding Lance Inconel 625,ISO Nickel Base Alloy Thermal Lance |
SA213 P11 Nickle Alloy CMT Cladding For Power Station Long Lifetime 60.5x3.8x6000mm
Production Information of CMT Cladding
Best-selling sand casting usage thermal lance
Material
|
Nickel alloy steel / Cladding Boiler Tube
|
Grade
|
N02200, N02201, N08020, N08330, N08800, N08810, N08811, N08825, N06600, N06601, N06625, N06686, N06690, N04400, N10276, N06059
|
Spec.
|
B161/163, B165, B167, B407, B423, B444, B462, B514, B515, B516, B517, B535, B619, B622, B626, B704, B705, B729
|
O.D.
|
6~219MM
|
W.T.
|
0.50~25MM
|
Length
|
6 Meters or customized
|
Finish
|
Annealed & Picked or OD Mechanical Polish(up to 600#) or Bright Annealed & OD Polish
|
Tolerance
|
As per spec.
|
Application
|
Petroleum, chemical industry, chemical fiber, smelt, medical machinery, paper making, heat preservation and refrigeration, mechanical equipment, food, electricity, water conservancy, architecture, aerospace, navigation shipbuilding, environmental protection and boiler heat exchanger.
|
Package
|
Standard seaworthy package: 1.plywood case 2.wooden pallet package 3.bundle packageand other package or as customer request.
|
MOQ
|
500 kilograms
|
Supply Ability
|
500 tons/month
|
Port
|
Shanghai
|
Payment Term
|
T/T with 30% deposit, balance before shipment
|
Delivery Time
|
Usually within 30-60 days after payment
|
The most common problem in surfacing is cracking. The main methods to prevent cracking are as follows
1. Preheat before welding, control interlayer temperature and slow cooling after welding
2. Stress relief heat treatment after welding
3. Avoid multi-layer surfacing and use low hydrogen surfacing electrode
4. If necessary, build up the transition layer between the surfacing layer and the base metal (use the electrode with low carbon equivalent and high toughness)
Attention must be paid to butt welding:
1. According to the use requirements, reasonable selection of surfacing alloy
2. Reduce the dilution ratio of base metal as much as possible
3. Improve productivity
4. It is expected that the hardfacing metal and base metal have similar expansion coefficient and phase transformation temperature
Purpose of surfacing welding of CMT Cladding:
1. Reduce costs
2. Extend service life
3. Reduce maintenance
4. Reduce spare parts
Our Service
High-quality products supplier
Customized products
Flexible requirements for order size
Diverse products
Competitive price
Professional technical and quality team
Professional sales team
FAQ
Q: Are you trading company or manufacturer ?
A: We are manufacturer
Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. or it is 25-35days if the goods are not in stock, it is according to quantity.
Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample extra
Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us